Definition of second-hand machinery and timely departure procedures
的 Definition of used machinery:
1) Electromechanical products that still have basic functions and a certain use value have been used
2) Mechanical and electrical products that have not been used but have been stored for too long beyond the quality guarantee period
3) Electromechanical products that have not been used but have been stored for a long period of time have significant loss.
4) Electromechanical products with mixed old and new parts
5) Large second-hand equipment
Many companies have rushed to ship second-hand equipment to China without completing the second-hand equipment import documents, and were only reminded by the customs when the goods arrived at the port. Company warehouse rent, cabinet rent, customs fines. Failure to report properly results in failure to clear customs or even cause the enterprise to complete the arrangement within the planned time, and the situation in which construction cannot begin.
Emergency treatment plan: Apply for repatriation (shipping country or Hong Kong)-apply for pre-inspection filing-apply for the Hong Kong Central Inspection This program takes about 25!
Import restrictions on used machinery
参考 Please refer to the old electromechanical products that are not allowed to be imported:
参考 Please refer to the old electromechanical products that are allowed to be imported: (the first batch of conditional record of imported old electromechanical products and the scope of use)
Please refer to the old electromechanical products allowed for import:
Note: Regulations on foreign investment in importing used equipment:
1) New and old mechanical and electrical products imported as investment within the total foreign investment are exempt from automatic import permits but old mechanical and electrical products must be processed.
2) New and old mechanical and electrical products imported as investment within the total foreign investment are exempt from pre-shipment pre-shipment filing, but old mechanical and electrical products must be handled.
3) The statutory inspection of foreign-invested imported old machinery and electronics and the product value appraisal are carried out in combination.
Documents required for import of used machinery
A import statutory inspection
B Import Electromechanical License (Old)
C Pre-shipment Inspection Certificate for Imported Used Mechanical and Electrical Products
(China's nine foreign inspection agencies are in Japan, Hong Kong, Bremen, Marseille, London, Canada, Europe, North America, Spain)
D Application Form for Import Used Mechanical and Electrical Products Filed by the Import Port Quarantine Bureau
E If the imported machine is a printing press, you need to apply for a printing business license at the National News General Summer
F If the product tax number involves national compulsory certification, a 3C certificate is required
G If the importing country is the United States, Japan, South Korea, European Union and other countries, IPPC (wooden packaging fumigation certificate) is also required.
Import license for used machinery
Second-hand machinery import license, that is, "Automatic Import License", "O-Certificate", as long as the machine has this regulatory condition at the customs, whether it is new or old, must be processed.
In order to monitor and analyze the import situation of mechanical and electrical products, the automatic import license management is implemented for some mechanical and electrical products that fall outside the prohibition of import and import restrictions. Before importing mechanical and electrical products subject to automatic import license management, the importing unit shall apply for an "Automatic Import License" to the Ministry of Foreign Trade and Economic Cooperation, or the local competent authority for foreign trade and economic cooperation, and the Department of Mechanical and Electrical Affairs, and hold the "Automatic Import License" 》 Go through customs formalities with the customs.
Application information for second-hand machinery import license
1. When applying for a certificate for the first time, you must provide a letter of introduction of the unit and the identity certificate of the person applying for the certificate to be filed in our office.
2. Application report must be provided when importing old equipment or equipment with more than 100,000 US dollars, and explain the situation in detail;
3. "Application Form for Import of Mechanical and Electrical Products";
4. Business license stamped with the special seal for copying by the industrial and commercial department;
5. "Import and Export Business Qualification Certificate" (copy);
6. New equipment imported by a single machine for more than 100,000 US dollars must provide a capital verification report;
7. When importing tax-free equipment, provide the project authority's approval;
8. For equipment imported by a commissioned agent, an agency import agreement signed between the client and the import operator shall be provided;
9. Other materials required by the Ministry of Foreign Trade and Economic Cooperation;
Second-hand machinery import operation process
1.First, the customs code (commodity code) of the imported equipment should be determined, because only when the accurate customs code is obtained can the regulatory conditions of the imported equipment be determined, that is, whether the automatic import license is approved by the Ministry of Commerce or the province or locality Approved by the Ministry of Commerce.
2.The next thing to complete is to prepare the materials and start the inspection of the imported equipment vendors.
3, then after the goods arrive at the Hong Kong terminal, change the order according to the row of the terminal, pick up the goods, and do the pre-shipment inspection.
4.After the completion of the inspection, the goods are temporarily stored in our warehouse in Hong Kong, and then the automatic import license (approval) is processed.It takes 20 working days here.
5. After the permit is obtained, it is to book warehouses and rent containers with shipping companies. It is arranged at Hong Kong Port --- barges at inland ports.
Strength.
6.After getting the customs clearance form, you can play the customs declaration form and perform the customs clearance action. From the customs clearance and price review, if there is no accident, the customs clearance process takes 4 working days, you can issue a tax bill, pay taxes, and release .
The import process of used machinery is as follows:.
1. Recording of second-hand machinery, issuing the "Pre-inspection Record of Imported Used Mechanical and Electrical Products before Shipment" (Certificate issued by Guangdong Bureau or National Bureau)
2. Overseas inspection, issued "Pre-shipment Inspection Certificate for Imported Used Mechanical and Electrical Products" (Issued by a foreign inspection agency (China Inspection Co., Ltd.)
3. Renew the certificate, and issue the "Pre-shipment Certificate for Import of Used Mechanical and Electrical Products before Shipment" (issued by Guangdong Bureau or National Bureau)
4. Import declaration and inspection.
Relevant materials to be submitted for filing of imported second-hand machinery
1 (1) "Application for Filing of Imported Used Mechanical and Electrical Products" (the applicant has the official seal and the legal representative's seal)
(2) "List of Imported Used Mechanical and Electrical Products" (the applicant has the official seal)
(3) Applicant, consignee, consignor business license or registration document (copy, applicant's official seal); (4) Trade contract or agreement (copy, applicant's official seal);
(5) If necessary, the following materials should also be submitted (except for photos, the applicants have their official seals stamped):
A: State of used machinery products, manufacturing year certification materials, color photos reflecting the characteristics of the products on file;
B: Environmental impact assessment opinions and safety assessment opinions concerning imported complete sets of used chemical equipment, smelting, pharmaceutical, printing and dyeing, papermaking, leather, energy, etc.
C: Legally valid after-sales service agreement involving imported second-hand machinery, after-sales service service organization or product owner's commitment to after-sales service, qualification certificate or business license of the after-sales service organization, issued by the official institution or its authorized institution Final annual inspection report, the use and maintenance records of each construction machine, relevant Chinese instruction manuals and recent photos;
D: Printing business license involving imported second-hand printing machinery;
E: Chinese instruction manuals, maintenance records, and unit usage time records or declaration materials related to imported engine sets.
F: Approval documents related to the import of used national tyres, environmental protection departments and relevant government management departments;
G: Corresponding CCC certification documents related to the import and export of old electromechanical products managed by the CCC certification system and used for sales, lease, repair and remanufacturing
The above is the general process of importing used machinery. If there is anything you do n’t understand, you can always consult me. I will provide you with the most reasonable import plan as soon as possible
Please contact me if necessary. The username is my phone number.
Customs machinery import declaration time:
1) Commodity inspection filing 10-20 working days (can apply for expedited processing, 5--7 working days)
2) Hong Kong Interim Inspection 3 working days
3) O certificate application 5-7 working days (local approval) 7-15 working days (national approval)
4) On-site inspection for 3 working days
5) 10 working days for customs declaration, price review, and customs clearance
It usually takes more than one and a half months to import and release second-hand machinery
National Second-hand Machinery Import Term
Generally calculated based on the average year of use of the machine, at the time of import, the customs or commodity inspection department shall:
一 、 General equipment
1. Machinery and equipment 10-14 years
2. Power equipment 11-15 years
3. Transmission equipment 13-15 years
4. Power transmission equipment 8-14 years
5. Automation control and instrumentation
Automatic and semi-automatic control equipment 8-12 years
Computer 4-10 years
General test equipment 7-12 years
6. Industrial Kiln 7-13 years
7. Tools and other production tools 9-14 years
8. Non-production equipment and appliances
Equipment 12-15 years
TV, copier, word processor 5-8 years
Printing machine 8-10 years
Second, special equipment
9. Special equipment for metallurgical industry 9-15 years
10. Special equipment for power industry
Power generation and heating equipment 12-20 years
Power transmission line 30-35 years
Distribution line 14-16 years
Transformer power distribution equipment 18-22 years
Nuclear power generation equipment 20-25 years
11. Machinery industry special equipment 8-12 years
12. Special equipment for petroleum industry 8-14 years
13. Special equipment for chemical and pharmaceutical industry 7-14 years
14. Electronic instrument telecommunication industry special equipment 5-10 years
15. Special equipment for building materials industry 6-12 years
16. Textile and light industry special equipment 8-14 years
17. Special equipment for mining, coal and forestry industry 7-15 years
18. Special equipment for shipbuilding industry 15-22 years
19. Nuclear industry special equipment 20-25 years
20. Special equipment for engineering vehicle construction 8-10 years
The above is some information on the import life of commonly used old machines for your reference. The specific requirements are subject to review by the customs or commodity inspection management department.